OVERCOMING
BASEMENT
BATHROOM
BLUES
compromise for easier installation on this project.
To make sure the surface of
the wood decking had a good
waterproof seal from the
inevitable drips in a bathroom
environment, Hal brush-applied
ProFlex Primer and Sealer over
the top of the plywood
decking.
A powder-actuated fastener is a
powerful tool for nailing the floor
plate of a partition wall to a
concrete subfloor.
After lifting the tub onto the platform, Hal is checking to ensure
the tub is level. Room to work is
critical to such a big project. This
photo was taken from an adjacent room, and the lack of wall
between the rooms made it easy
to transport the tub into the
space. Erecting the partition wall
between the two rooms is the
final phase of the project.